Ventilation shaft excavation for a condominium development project in Burnaby.
Scope of Work
The scope of work involved ventilation shaft excavation in one of the condominium development projects in Burnaby. The primary objectives included slab preparation and mechanical trenching for all below-grade utility services including mechanical and electrical. The project involved rock breaking and excavation to establish the necessary infrastructure. The rock breaking process was conducted using appropriate methods and equipment to fracture and disintegrate the existing rock formations. This ensured safe and efficient excavation and preparation for the ventilation shaft. Excavation was carried out to remove the fragmented rock material and create the required space for the ventilation shaft. The excavation process was performed with precision, taking into consideration safety protocols, engineering specifications, and local regulations.